AlbumUp to Main Album Listing
   FolderLine Construction Details

Do you enjoy the Picture Poster?
Are you an ICON Sponsor?
PayPal button


POST

Title Name Date Updated Hits
Long Beach, CA. Old 4kv Distribution Transformer with Plug Style Fuse Cutout. Joe Maurath, Jr. March 26, 2020 146
Long Beach, CA, 4kv Residential Distribution Along Alley, Pole Top Extension. Joe Maurath, Jr. March 26, 2020 March 31 130
Long Beach, CA. 12kv on Pole Extension with Old 4kv 3-phaseTransformer Bank Joe Maurath, Jr. March 19, 2020 171
Yucaipa, CA. 12kv Deadends Using Suspension Insulators on Crossover Pole. Joe Maurath, Jr. March 19, 2020 151
Yucaipa, CA. Three Phase 12kv Transformers on Platform, Heavy Openwire Secondary Cables Joe Maurath, Jr. March 19, 2020 159
San Bernardino, CA. Old Three Phase Transformer Bank Mounted Between Two Poles. Joe Maurath, Jr. March 19, 2020 152
San Bernardino, CA. 4kv Primaries with an Old 3-phase Transformer Bank. Joe Maurath, Jr. March 19, 2020 152
Steel Subtransmission Lattice Towers Along Los Angeles Street. Joe Maurath, Jr. March 19, 2020 143
Old Lattice Tower Used by LADWP and Southern California Edison (SCE). Joe Maurath, Jr. March 19, 2020 143
Los Angeles Dept. of Water and Power (LADWP) and SCE LatticeCorner Tower Joe Maurath, Jr. March 19, 2020 139
Los Angeles Dept. of Water and Power (LADWP) 287kv Double Circuit Tower. Joe Maurath, Jr. March 11, 2020 183
W. Covina, CA. Double Circuit 12kv Pole with Safety Grounding Taps. Joe Maurath, Jr. March 11, 2020 164
Huntington Beach, CA. Platform Mounted Pair of Street Lighting Regulators. Joe Maurath, Jr. March 11, 2020 160
W. Covina, CA. Oval Distribution Transformer with Cooling Tubes. Joe Maurath, Jr. March 11, 2020 168
W. Covina, CA. Platform-Mounted Three Phase Transformer Bank. Joe Maurath, Jr. March 11, 2020 164
San Bernardino, CA. Corner Pole with 4kv Transformer, Plug-In Cutout and Insulators. Joe Maurath, Jr. March 11, 2020 158
Brown Insulators and Open Cutouts Removed From Former Transformer Pole Joe Maurath, Jr. March 11, 2020 182
L.A. Vicinity: New Fuse Cutouts for Upgraded Pole. Joe Maurath, Jr. March 11, 2020 157
Top Section of Removed 11kv Pole with Brown Insulators and Open Cutouts. Joe Maurath, Jr. March 11, 2020 175
115kv Connections and Switchgear at CalElectric Substation Joe Maurath, Jr. March 11, 2020 143
San Bernardino, CA. 33kv 4-Circuit Lattice Tower with Multipart Porcelain Insulators. Joe Maurath, Jr. March 11, 2020 136
San Bernardino, CA. 4-Circuit 33kv Lattice Corner Tower at 115kv Substation. Joe Maurath, Jr. March 11, 2020 132
San Bernardino, CA. Steel Lattice Pole with Wood Crossarm. Joe Maurath, Jr. March 11, 2020 140
J-D disks on distribution David Dahle March 1, 2020 213
San Bernardino, CA. 33kv Corner Pole Making 90-degree Bend Using Deadends on Alley Arms Joe Maurath, Jr. February 29, 2020 170
San Bernardino, CA. View 2 of 115kv to 33kv Substation. Joe Maurath, Jr. February 29, 2020 144
San Bernardino, CA. View 1 of 115kv to 33kv Substation. Joe Maurath, Jr. February 29, 2020 138
San Diego Vicinity. Old Westinghouse Distribution Transformer. Joe Maurath, Jr. February 29, 2020 163
Santa Ana, CA. Delta Connected Transformer, 12kv to 120/240 Volts Secondary. Joe Maurath, Jr. February 29, 2020 148
Rubidoux, CA. Lineman Atop 66kv Pole Tying Wire to Large Multipart Insulator. Joe Maurath, Jr. February 29, 2020 168
Fullerton, CA. Old 12kv to 2.3 or 4kv Stepdown Transformer. Joe Maurath, Jr. February 29, 2020 157
Los Angeles Vicinity. Platform Transformer Bank. Joe Maurath, Jr. February 29, 2020 147
W. Covina, CA. Line Crews Working on 66kv Subtransmission Pole. Joe Maurath, Jr. February 29, 2020 141
W. Covina, CA. Line Crews Working on 66kv Subtransmission Circuits. Joe Maurath, Jr. February 29, 2020 137
Hemet, CA. 33kv Pole with KPF (brand) Disconnect Switch, Old Distribution Gear. Joe Maurath, Jr. February 29, 2020 166
Hemet, CA. Three Old Crossarm Mounted Transformers. Joe Maurath, Jr. February 29, 2020 151
The end of the line 2 Hagen Stamps-Hill February 17, 2020 233
The end of the line Hagen Stamps-Hill February 17, 2020 224
San Bernardino, CA. 115kv Wishbone Construction Pole Line. Joe Maurath, Jr. February 16, 2020 195
Rialto, CA. 1950s Fisher Pierce Tube Powered Photoelectric Lighting Control. Joe Maurath, Jr. February 16, 2020 178
W. Covina, CA, 66kv Double Circuit Switch Pole Replacement. Joe Maurath, Jr. February 16, 2020 164
Alhambra, CA. Street Lighting Regulator Activated by Master Loop. Joe Maurath, Jr. February 16, 2020 179
San Diego, CA. Early Rectangular Westinghouse Distrubution Transformer. Joe Maurath, Jr. February 16, 2020 168
San Diego, CA. Regulator and Oil Switch that Ran Street Series Incandescent Lights Joe Maurath, Jr. February 16, 2020 173
Fullerton, CA. Old Regulator and Oil Switch for Series Street Lighting Loop. Joe Maurath, Jr. February 16, 2020 176
Southern California Edison 500kv Towers Crossing Over LADWP 287kv Line Joe Maurath, Jr. February 16, 2020 171
Los Angeles Department of Water and Power (LADWP) 287kv Transmission Tower Joe Maurath, Jr. February 16, 2020 154
Bellflower, CA. Primary Distribution and Utility Dispatching Open Wire. Joe Maurath, Jr. February 16, 2020 165
Fullerton, CA. Fog Type Suspensions with 12kv Solid Blade Switches Beneath Joe Maurath, Jr. February 16, 2020 157
San Bernardino, CA. 33kv with Series Street Lighting Regulator Beneath. Joe Maurath, Jr. February 16, 2020 174

Next pictures Next 50 pictures