Sightseein' the Transbay Transit Center Construction Site 4

By Colin Jung; posted June 17, 2013

View Original: Click to zoom, then click to magnify (968 x 1296) 454KB

 


I believe this is Zone 2. Average depth of excavation in this zone is around 60-65 feet below existing grade. Those large pipes are actually bracing the walls of the pit. The heavy scaffolding supports the weight of the construction equipment, like the crane in the photo.