Well, somewhat. This unit has been UPized, but still looks good. The engineer of this train, MPRPB 23, had some "problems" with the lead unit, which was the UP unit now third in the consist in this shot. He rearranged the power and put the Rio Grande on the point. I really wonder just how bad those problems were. Anyway, I'm glad he put on a good show. 5-24-2007. |